Wellcome to National Portal
Main Comtent Skiped

Services list

With the approval of the Upazila Irrigation Committee, the security deposit is received, the signature is signed and the LLP is supplied. The rate of annual service charge of LLP is as follows:


- 5 cusec diesel / bio-meter annual rental of 15,000 / - Electric Motors - 20000 / - One time deposit of Rs. 7000 / -
- 2 cusec diesel / bio-meter annual rental of Rs. 7,000 / - Electric motor-10000, one time at a time of 5000 / -

- 1 cusec diesel annually Rs 4000 / -, electric motor -5000 / - one-time securities up to Rs 3000 / -

- Irrigation infrastructure was also built for the cultivation of Irri Borrow.
- Irri Baur Mosaic in the union based area, the irrigation count and the amount of irrigated land are determined which are collected based on the upazila.
- Water samples and samples are collected. Water samples like arsenic, saline, iron, pH, EC, TDS and hardnes are tested.
- In line with the receipt of the payment of water, the irrigation channels and electricity lines are constructed and the transformers are provided.
- With the approval of the Upazila Irrigation Committee, the canal re-excavation and irrigation infrastructure are laid down.

Irrigation charges of 5 cusec diesel engine, 15000 / - per season, security deposit of Rs. 7,000 / -

Irrigation charge of 5 cusec electric motors is Rs 20,000 / - per season, security up to Rs 7,000 / -

2 cusec diesel engine irrigation charges for every season Rs. 7,000 / -

01 Kusak diesel engine irrigation charges Rs 4,000 / - per season, secured up to Rs 3,000 / -

Irrigation charges of 2 cusec deep tube wells cost Rs 23,500 / - per season.